How to Compare Solar Quotes: A Side-by-Side Bid Worksheet

Photovoltaic panels installed on a house roof in a winter view near Boston.

Quick answer: Compare solar quotes as complete projects—not monthly payments. Put each installer’s equipment, system size, cash price, required extra work, production assumptions, financing and warranties into the same worksheet. Mark missing information rather than guessing. The FTC recommends detailed written bids covering system size, expected output, full installation costs, guarantees and warranties. (consumer.ftc.gov)

This guide is for U.S. homeowners, with example prices in U.S. dollars (USD). The examples are fictional calculations, not market-price benchmarks or actual installer offers.

1. Give every installer the same project brief

Start with a shared brief so installers are answering the same question. Provide:

  • The same 12 months of electricity consumption, measured in kilowatt-hours (kWh).
  • Any planned changes, such as an electric vehicle or heat pump, listed separately from current consumption.
  • Your roof’s known age, condition and planned replacement work.
  • Whether you want solar alone or a separately priced battery option.
  • Your priorities: purchase cost, electricity generation, backup capability or a combination.

Roof suitability, shading and location affect a solar project. DOE recommends having qualified professionals assess the roof and obtaining multiple installer assessments rather than relying solely on remote estimates. Do not climb onto the roof to investigate suitability yourself. Source: DOE’s consumer installation guide.

Keep cash purchases and financed purchases together for the initial equipment-and-scope comparison. Put leases and power purchase agreements (PPAs) on a separate financial comparison: they are different arrangements, and a low lease payment does not describe the purchase price of an owned system. (consumer.ftc.gov)

2. Copy this solar quote comparison worksheet

Create one column per bidder. Replace each dash with a figure, a contract-page reference or “not provided.” Keep the proposal date and version with every entry.

The worksheet below combines the FTC’s written-bid guidance with fields in SEIA’s purchase disclosure, including payment timing, interconnection responsibility, roof coverage and generation assumptions. It is an organizing tool, not a substitute for the contracts. (consumer.ftc.gov)

Item to record Bid A Bid B Bid C
Proposal date, version and expiration — — —
Seller, installer and any subcontractors — — —
Panel manufacturer, exact model, quantity and watts per panel — — —
Total panel capacity, kW DC — — —
Inverter/optimizer models, quantities and AC rating — — —
Layout, roof areas used and substitution terms — — —
Year-one generation estimate, kWh — — —
Shading, orientation, system losses and aging assumptions — — —
Cash installation price before incentives — — —
Permits, inspections, taxes and utility fees included — — —
Electrical, roof, trenching and other exclusions — — —
Comparable project cost after required extras — — —
Down payment, loan principal and itemized financing charges — — —
APR, term, payment changes and total payments — — —
Deposit and subsequent payment milestones — — —
Installation, inspection and interconnection responsibilities — — —
Equipment, workmanship and roof-leak coverage — — —
Service labor, travel and shipping coverage — — —
Production guarantee and shortfall remedy—or none — — —
Cancellation, change-order and transfer terms — — —

For equipment, ask for the actual model numbers—not “premium panels” or “equivalent inverter.” If substitutions are permitted, ask what approval you retain and whether the installer must update the production estimate and warranty documents.

If one proposal includes a battery, request a solar-only subtotal and a separate battery scope. Otherwise, leave the combined package out of your solar-only price ranking.

3. Compare complete cash costs before financing

Use two calculations:

Comparable cash project cost = quoted cash installation price + required excluded work

Cash price per watt = cash solar installation price ÷ panel capacity in DC watts

Keep the numerator clearly labeled. A solar-only price per watt and a price including electrical upgrades answer different questions; do not silently mix them.

Worked example: the cheaper headline price loses

Assume both fictional bids describe the same 8.0 kW DC array, equipment and installation scope, except for a required electrical upgrade.

Comparison Bid A Bid B
Quoted cash price before incentives $24,000 $26,000
Required electrical upgrade $3,000 extra Included
Comparable cash project cost $27,000 $26,000
Comparable project cost per DC watt $3.38 $3.25

Bid A initially looks $2,000 cheaper. Once the required upgrade is included, Bid B is $1,000 cheaper.

This conclusion depends on the stated assumptions. If the upgrade price remains unknown, write “$24,000 plus unpriced required work,” not $27,000. An allowance is not a fixed quotation.

The lower monthly payment can still cost more

Now suppose the fictional financing offers are:

Financing term Bid A Bid B
Loan principal $30,000 $26,000
Fixed annual interest rate; assumed APR* 3.99% 6.99%
Term 25 years 15 years
Monthly payment, approximately $158.19 $233.55
Total scheduled loan payments, approximately $47,456 $42,039
Required work paid separately $3,000 $0
Total scheduled project outlay $50,456 $42,039

For this simplified calculation, there are no separately assessed credit charges beyond the stated principal and interest.

Bid A has the lower payment but approximately $8,417 more total scheduled outlay, including the separate upgrade. It also requires payments for ten additional years.

These are fixed-payment amortization calculations using unrounded payments before rounding totals. They assume no down payment, prepayment, payment reset, incentive payment, balloon payment or additional fees. Actual schedules may differ slightly because of rounding.

The CFPB has documented solar loans with financing markups embedded in principal, as well as payment structures that assume a substantial borrower prepayment. Ask the lender—not only the salesperson—to explain the cash-to-financed price difference, required lump sums and every possible payment change. A quoted APR alone does not settle the comparison. (consumerfinance.gov)

Keep incentives outside the base-price ranking until their current rules, timing and your eligibility have been independently checked. This example assumes none.

4. Check whether generation forecasts use comparable assumptions

Panel capacity and annual electricity production are different worksheet entries. Record system capacity in kW DC and projected annual energy in kWh. SEIA’s disclosure separates both figures and asks for the assumed annual production decline. (seia.org)

For a diagnostic comparison:

Annual production per installed kW = projected annual kWh ÷ system kW DC

Suppose fictional Bid A forecasts 11,200 kWh from 8.0 kW, while Bid B forecasts 12,000 kWh from the same capacity:

  • Bid A: 11,200 ÷ 8 = 1,400 kWh per kW
  • Bid B: 12,000 ÷ 8 = 1,500 kWh per kW

That difference is a question to investigate, not proof that either forecast is wrong. Ask both installers to disclose their roof layout, shade assessment, tilt, orientation, inverter sizing and modeled losses.

PVWatts can provide a preliminary production cross-check. Its documentation explains the required design inputs and cautions that its estimates omit factors important to detailed system design. It does not replace a professional site assessment.

Keep the generation forecast separate from the savings forecast. Ask which utility tariff, export compensation and future electricity-rate increases underpin the savings calculation. ENERGY STAR notes that compensation for exported electricity varies, and in some areas is lower than the retail electricity rate. Source: ENERGY STAR rooftop solar buying guidance.

Photovoltaic panels installed on a house roof in a winter view near Boston.
Rooftop photovoltaic panels on a house near Boston, Massachusetts. — Gray Watson. http://256.com/solar/ Source CC BY-SA 3.0

5. Separate equipment warranties, workmanship and production promises

A warranty headline is not enough. Request the governing documents and record who owes each obligation.

Distinguish:

  • Equipment coverage: defects in the specified products.
  • Workmanship coverage: problems attributable to installation.
  • Roof coverage: leaks or damage covered under the installation agreement.
  • Service coverage: diagnosis, travel, removal, replacement labor and shipping.
  • Production guarantees: a contractual minimum output and a defined response to a shortfall.

Manufacturer documentation illustrates why these distinctions matter. An Enphase limited warranty with an effective date of September 1, 2025 excludes specified removal, reinstallation and electrical troubleshooting labor. That document also directs readers to verify the correct warranty for their product; it should not be assumed to govern every Enphase installation. (enphase.com)

For any production guarantee, ask:

  1. What minimum kWh is guaranteed, and over what measurement period?
  2. How does the threshold change over time?
  3. Which outages, shading changes or other conditions are excluded?
  4. What records must you submit, and by when?
  5. Is the remedy repair, payment, credit or something else?

A production estimate can appear in a contract without becoming a guarantee. An archived New York purchase-agreement sample, for example, lists estimated annual output but expressly disclaims a minimum production guarantee. It is an illustration of contract structure—not a current offer or recommended template. (documents.dps.ny.gov)

6. Tie payments to clearly defined project milestones

Ask for a payment schedule in both dollars and triggering events.

SEIA’s sample disclosure distinguishes payments at signing, installation commencement, installation completion and a separately identified final-payment event, such as interconnection. It also asks who submits the interconnection application. (seia.org)

For your comparison, ask:

  • Does “completion” mean equipment installed, inspection passed or utility authorization received?
  • Who corrects inspection deficiencies and handles utility paperwork?
  • When do loan payments begin?
  • What happens financially if installation or utility approval is delayed?
  • What documentation releases each payment?
  • How are equipment substitutions and unexpected work approved?

Request written change orders showing the revised scope, price and schedule before approving extra work. The archived New York sample illustrates such a signed change-order provision, but your own agreement must be reviewed on its own terms. (documents.dps.ny.gov)

Do not assume a cancellation deadline from another homeowner’s contract applies to yours. Identify the applicable notice, deadline, method and any charges before signing; get qualified local advice if the language is unclear.

7. Resolve missing answers before choosing a bidder

Use three statuses for every worksheet row:

  • Confirmed: documented in the current proposal, contract or attachment.
  • Pending: the installer owes a clarification or fixed price.
  • Different: the bids intentionally offer different equipment, scope or obligations.

Then send each finalist one consolidated request:

Please provide a revised proposal resolving the pending items, with a cash price before incentives, exact equipment schedule, priced exclusions, financing documents, payment milestones and applicable warranty documents. Please identify any remaining differences from the attached project brief.

Before making your decision, check the installer’s required credentials with the relevant licensing authority and review its complaint history. The FTC recommends checking state and local consumer-protection agencies and contractor licensing boards. (consumer.ftc.gov)

The practical decision rule: First establish comparable scope. Then compare complete cash cost, financing obligations, forecast credibility and enforceable service coverage. If a material cost or obligation remains unknown, the price comparison is not finished.